Total Cost: $7858.00
In Fall 2008 we were contracted to scrape, repair and
caulk/repaint a 25 yr old Viceroy home at the base of the
Hamilton Escarpment.
Prep work took approximately 27hrs, lots
of high ladder work (anchored platforms and extension
ladders). Prep Coat: BIN 123 Deep Tint Primer
and Final coat was Sherwin Williams Duration
Flat Lo-Temp and the color used was Foggy Day
(SW 6235). We broke the project down into 4 phases
due to the sheer size (6400 sq ft of heavy surface prep
on cedar Hardie siding).
Ladder and roof work was tricky but we made
sure to anchor our platforms with Remington
2 1/2 nails into the roof substrate and repaired
afterwards with Black Knight Fibrated Coatings
under each penetrated shingle.
Big thanks to Leanne Allard for making my life
easier by assisting on the job !
We even replaced the duct caps and put
new UV resistant caulking in all lap seams
in addition to plugging all bee holes with
a carbaryl injected foam repellant to stop
carpenter bee infestation.
Special thanks to Anita and Paul F.