Total Cost: $7858.00


In Fall 2008 we were contracted to scrape, repair and

caulk/repaint a 25 yr old Viceroy home at the base of the

Hamilton Escarpment.



Prep work took approximately 27hrs, lots

of high ladder work (anchored platforms and extension

ladders). Prep Coat: BIN 123 Deep Tint Primer

and Final coat was Sherwin Williams Duration

Flat Lo-Temp and the color used was Foggy Day

(SW 6235). We broke the project down into 4 phases

due to the sheer size (6400 sq ft of heavy surface prep

on cedar Hardie siding).



Ladder and roof work was tricky but we made

sure to anchor our platforms with Remington

2 1/2 nails into the roof substrate and repaired

afterwards with Black Knight Fibrated Coatings

under each penetrated shingle.



Big thanks to Leanne Allard for making my life

easier by assisting on the job !



We even replaced the duct caps and put

new UV resistant caulking in all lap seams

in addition to plugging all bee holes with

a carbaryl injected foam repellant to stop

carpenter bee infestation.



Special thanks to Anita and Paul F.