recently - here are the before and after pictures.
All epoxy floors are first pressure washed, etched then
sandlblasted to create an effective anchor profile
for the coating system to adhere to. Skip these
steps and it will peel like a bad sunburn in 60-90
days.
Installed epoxy floors are 2.00 per sq/ft2 complete !
We use Sherwin Williams' WaterBased Catalyzed
Epoxy and had it custom colorized to a Granite Grey
Colour.
Homeowner will add striping at a later date for
garage bins, bikes and other garage items once
coating system is cured completely.
As a bonus we skim coated the garage drywall
and sprayed up two coats of ProMar 200 Semi
Gloss White (B31 Series) to brighten the area up.
Great thanks to Jeff K. for the project !
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.